Dutch Sailingtjalk, 20 pax No longer available
Dimensions (m):
25.60 x 5.05 x 1.00
Ref. no.:
180611
Mooring:
Near Amsterdam, Netherlands
Construction year:
1896
Material:
steel
Vision Doeve Brokers
Former inland cargo barge that is currently in use as a sailing charter ship for 20 hotel guests or 30 day passengers. The guest quarters has a total of 7 cabins, a shower, toilet, salon and galley. The aft cabin is for the skipper / owner and is spacious and fitted out with an own galley, cabin with 2-persons berth and a toilet. The sailor has the forward cabin at his disposal and it is fitted out with a berth and a washbasin. The state of maintenance of this barge is good. In March 2018 the mast was replaced for a steel one. This barge is ready to be used equally as a charter ship or as a (sailing) Live Aboard / houseboat. She is definitely worth a visit.
More information
General information
Yard: | Shipyard H. Kroeze, NL-Hoogezand/Martenshoek |
Hull shape: | flatbottom |
Hull material: | iron |
Deck material: | steel iroko |
Superstructure material: | steel pitch pine steel hatches covers over hold |
Construction method: | riveted new steel is welded wide side decks (gunnels) rubbing strake bulwark 3 watertight bulkhead(s) deckhouse |
Steering system: | mechanical wheel hardwooden rudder |
Windows: | double glazing & single glass hardwood window frames hardwood outside doors |
Displacement (approx.): | maximum allowable displacement 93,428 m3 displacement in empty condition 67,122 m3 displacement 26,306 m3 |
Ballast (approx.): | concrete blocks |
Airdraft (approx.): | 25,00 m |
Owner: | Dutch owner |
Registration: | B-registered Costs for the change of ownership and / eventually deletion are for purchasers amount. |
Colour / Paint System: | one component system |
Certificates: | inland waterways certificated (TRIWV / ES-TRIN) zone 2, 3 & 4 NL Waal, Lek & NL Rhine |
Suitable for / as: | useful as charter suitable as a year round live- aboard |
General information: | Hand over in consultation, charter contracts must be complied. Know-how and information about sailing areas can be passed on. Training of a new crew may be discussed. Sellers are possibly willing to part finance. |
Additional information: | Specified beam excludes the leeboards. 30 day guests 20 hotel guests |
Website, Web Domain & Email Address: | The ship is offered including the website, domain name, and the linked email-addresses. Costs for registering the site are for the account of the purchaser. |
Technical information
Enginepower: | 105 Hp 77 kW |
Engine brand: | DAF |
Revolutions: | 2200 RPM |
Engine model: | DD 575 |
Number of cylinders: | 6 |
Construction year engine: | 1963 |
Running hours (approx.): | unknown |
Fuel: | diesel |
Fuel tank (approx.): | 1x 600 litre steel tank(s) sludge trap(s) |
Cooling system: | intercooling dry exhaust insulated exhaust |
Propulsion: | 3 blade propeller greased lubrication of propeller shaft |
Gearbox: | PRM (Newage Coventry) hydraulic |
Heating: | Kabola B12 Tap central heating combi boiler on diesel & stove on wood |
Electricity system: | 12 / 24 / 230 Volt 230 Volt shore power connection |
Batteries: | 4x 230 Ah domestic batterie(s) (2017) 2x 140 Ah starter batterie(s) (2017) 1x starter batterie(s) generator |
Battery charger: | Mastervolt Mass battery charger 24/40 |
Earth-leakage breaker: | present |
Genny: | Mitsubishi whisper set 10 kVA 1500 RPM |
Inverter: | inverter 24/4000 |
Fresh water tank (approx.): | 3000 litre 2 steel tank(s) cemented tank(s) |
Water pressure system: | Speck hydrophore pump |
Hot water system: | through the central heating |
Holding tank (approx.): | not present, enough space to build-in |
Bilge pump: | 1 electric pump |
Gas system: | yes, bottle(s) in bottle box Gas certificate |
Additional information: | electrical system has been Megger tested partly LED lightning |
Accommodation
Interior: | various materials have been used pine floor(s) very well maintained see photographs |
Insulation: | Rockwool vapor return film |
Cabins: | 9 cabins |
Berth: | Guest cabin(s): 4x 2-pers bunk bed: Guest cabin(s): 3x 4-pers bunk bed: Forward: 1x 1-pers Aft: 1x 2-pers |
Lay-out plan (not to scale): | see attachment |
Bathroom: | guest cabins with wash basin hot & cold running water shower thermostat tap in 1 area together with the toilet Forward: washbasin hot & cold running water |
Toilet / Heads: | guest accommodation: 2x hand pumptoilet Aft: hand pumptoilet |
Galley: | 2x L-shape galley |
Cooker: | 1x 6-burner hob on gas stainless steel 1x 4-burner hob on gas |
Oven: | gas oven |
Fridge / Refrigerator: | 2x present 2x 230 Volt |
Freezer: | 1x small ice compartment |
Worktop: | 1x stainless steel worktop 1x hardwooden worktop |
Washbasin: | 2x stainless steel sink & 1x stainless steel sink |
Water tap: | 2x hot & cold running water |
Entertainment: | radio/CD player flatscreen TV |
Headroom (approx.): | salon (approx.) 1,94 m galley (approx.) 1,88 m cabins (approx.) 1,93 / 1,87 m bathroom / toilet (approx.) 1,84 m corridor / walkthrough (approx.) 1,94 / 1,79 m foc's hole (approx.) 1,63 m aftcabin (approx.) 2,04 m aftcabin (approx.) 1,58 m toilet aft (approx.) 1,52 m |
Additional information: | coffee machine Full charter inventory is present. (30 pax) beer tap |
Navigation equipment
Navigation equipment: | Comnav Voyager X3 Automatic Identification System (AIS) Sailor RT2048 VHF ICOM M59 Euro VHF navigation lights clock |
Rigging and sails
Rigging type: | gaff rigged |
Mast: | steel (03-2018 by SRF, NL-Harlingen) |
Lowerable: | no |
Boom: | wooden boom (2018) |
Gaff: | wooden gaff |
Jib boom / Bowsprit: | wooden Jib boom |
Leeboards: | hardwooden leeboards 2x leeboards winch electric operated centreboard |
Winches: | sail winch with 4 reels |
Material of the sails: | Dacron |
Sails: | mainsail 140 m2 boom jib 60 m2 yankee 40 m2 watersail |
Additional information: | jibboom |
Equipment
Anchor equipment: | manual anchor winch warping drum Klipp anchor anchor chain in hawse-hole |
Searail / Pulpit: | searail on bulwark |
Safety: | life buoys fire extinguishers life jackets 4x liferaft automatic fire extinguishing system in engine room according to the certification requirements |
Additional information: | gangway Survey report of the underwatership is available (10-2016) sundeck 3x hard wooden skylight |